Galaxy Power System Verification Procedures
Issue 3 January 2008 Galaxy Millennium Controller Performance Verification Procedures 3 - 5
Alarm Test, continued
Remote Alarm Test Using EasyView to perform the Alarm Test, hardware switches
SW202-5 on the BSH board and SW204-2 on the BSJ board (Figure
3-1) must first be enabled, in addition to the software switches located
at menu path.
EasyView: CONFIGURE DC PLANT HARDWARE AND
SOFTWARE CONFIGURED
Both the Alarm Test and Remote Alarm Test fields must be enabled.
To start the Alarm Test in EasyView, follow the menu path:
EASYVIEW: CONTROL ALARM TEST
A dialog box will appear with the status of the alarm relays being tested.
See above for the order in which the alarm relays will operate.
The selection of relays to be operated, as well as the duration of relay
operation, may be selected in EasyView by following the menu path:
EASYVIEW: CONFIGURE ALARM TEST